Planning Asbestos Surveys in Schools During the Christmas Holidays

Asbestos surveys for schools during the Christmas holidays by ACS

School holidays can provide a useful opportunity to arrange building checks and planned maintenance without the usual movement of pupils, staff and visitors. For estates and facilities teams, the Christmas closure may be one of the few periods when certain rooms or buildings can be accessed with less disruption. If asbestos information needs checking, or building work is planned for the new term, it is worth starting the arrangements early.

Planning asbestos surveys for schools in advance gives estates teams more time to review existing records and identify areas that may require further investigation.

However, a quiet school does not remove the need for careful planning. Asbestos surveys for schools should be commissioned for a clear purpose, carried out by competent professionals and considered alongside the school’s asbestos management arrangements. A survey is not simply a box to tick before contractors arrive.

It helps those responsible for the premises understand what materials may be present and what precautions are needed before work begins.

Why school buildings need careful asbestos management

Asbestos was used in many building products during the twentieth century because it was durable, heat-resistant and versatile. It was used extensively in schools and other public buildings before its use was banned in Great Britain in 1999. The Health and Safety Executive (HSE) explains that school buildings built or refurbished during this period may still contain asbestos-containing materials (ACMs).

Asbestos is most dangerous when fibres become airborne and are breathed in. Materials that are in good condition and unlikely to be disturbed can often be managed safely in place. The priority is to know where they are, assess their condition and prevent accidental disturbance. Where materials are damaged, vulnerable or likely to be affected by planned work, a competent asbestos professional should advise on the appropriate action. Regular reviews and appropriate asbestos surveys for schools help responsible organisations maintain accurate information about the condition and location of asbestos-containing materials.

The Department for Education’s guidance, Managing asbestos in your school or college, states that schools and colleges in England should have an up-to-date survey unless all structures on the site were built wholly after 2000. Schools in other UK nations should also follow the relevant national guidance and arrangements.

Why the Christmas closure can be a useful planning window

The Christmas break may offer a practical opportunity to arrange inspections, follow-up surveys or building work that would be difficult to coordinate during a normal school day. Access can be easier to organise when classrooms and corridors are not in routine use, although caretakers, cleaning teams, security staff and other contractors may still be on site. Planning asbestos surveys for schools around the Christmas closure can give surveyors better access to areas that may be difficult to inspect during term time.

The closure dates should not be treated as a reason to rush. Surveyors need suitable access, clear instructions and time to report their findings. If the survey identifies a concern, the school may need time to consider the findings and agree the next steps. Remedial work may require separate planning, specialist contractors and additional controls.

For this reason, asbestos surveys for schools should be discussed well before the building closes. Confirm which areas need inspecting, who can provide access, whether keys or permits are required and whether other contractors will be working in the same areas. If the site is part of a multi-academy trust or local authority estate, check the approval and procurement process early. Early communication with an experienced survey provider can help ensure asbestos surveys for schools are arranged within the available holiday access window.

Which type of asbestos survey does your school need?

Choosing the right scope is an important part of arranging asbestos surveys for schools. The right survey depends on what the school needs to do. A competent surveyor should be given details of the building, its use, existing asbestos records and any planned works so they can advise on the appropriate scope.

Management surveys

A management survey is intended to help manage asbestos during normal occupation and use of a building. It aims to locate, as far as reasonably practicable, ACMs that could be damaged or disturbed during everyday activities, assess their condition and provide information for the asbestos register and management plan. Asbestos surveys for schools should provide sufficient information for the dutyholder to understand which materials need monitoring and how they should be managed.

This type of survey is not a guarantee that every hidden material has been found. Some areas may be inaccessible, and the report should identify areas where asbestos is presumed to be present or where its presence cannot be ruled out.

Refurbishment and demolition surveys

If the school is planning refurbishment, intrusive maintenance or demolition, a management survey may not be sufficient. A refurbishment or demolition survey is intended to locate ACMs in the area affected by the planned work, including materials hidden within the building fabric. The survey is intrusive and the relevant area normally needs to be vacated while the survey takes place.

Do not assume that a previous management survey gives contractors all the information they need for a new project. The scope of the planned work should be checked against the existing survey information. If there is any doubt, seek advice from a competent asbestos surveyor before work starts.

What the law expects schools to do

The Control of Asbestos Regulations 2012 set out the duty to manage asbestos in non-domestic premises, including schools. The dutyholder is generally the person or organisation responsible for maintenance or repair, although responsibilities vary according to the school’s ownership and management arrangements. A local authority, academy trust, governing body, proprietor or more than one party may have responsibilities.

The duty to manage asbestos includes identifying or presuming the presence of ACMs, assessing their condition and the risk of exposure, keeping an asbestos register, preparing and implementing an asbestos management plan, monitoring condition and sharing relevant information with anyone who may disturb the materials.

The HSE’s Management of asbestos in school buildings 2022/23 report found that most schools inspected were managing asbestos effectively. However, 7% had failings significant enough for enforcement action to be required. This is a useful reminder that having paperwork on file is not enough: records, responsibilities and checks need to work in practice.

The school’s asbestos management plan should explain who is responsible, how the register is maintained, how materials are checked, how contractors receive information and what staff should do if suspected asbestos is damaged. The plan should be reviewed regularly and when circumstances change. Keeping survey information up to date is an important part of ensuring asbestos surveys for schools support the wider duty to manage asbestos safely.

How to prepare for a school asbestos survey

A few practical steps can help asbestos surveys for schools run smoothly and make the results easier to use. Following a structured preparation process helps ensure asbestos surveys for schools produce useful findings that can be incorporated into the school’s ongoing management arrangements.

  1. Review the existing records. Gather the current asbestos register, management plan, previous survey reports, plans of the building and records of any removal or remedial work.
  2. Define the purpose. Explain whether the survey is for routine management, planned refurbishment, a proposed installation or another specific need.
  3. Identify the areas. Mark the rooms, service areas, plant rooms, ceiling voids or other spaces that need to be considered. Tell the surveyor about restricted or inaccessible areas.
  4. Arrange access. Confirm dates, keys, alarms, sign-in arrangements, permits and the name of the person meeting the surveyor.
  5. Coordinate other work. Share details of planned electrical, heating, IT, roofing or building work. Different activities may affect the survey scope or access arrangements.
  6. Allow time for reporting. Agree when the report will be provided and who will review the findings. Avoid scheduling follow-on work before the relevant information has been assessed.
  7. Update the records. Once the report has been reviewed, update the asbestos register and management plan as required, and communicate relevant information to staff and contractors.

What should happen after the survey?

A survey report should be reviewed by the person responsible for asbestos management, not simply filed away. Check the location and condition of any identified materials, any areas where access was restricted, and the surveyor’s recommendations. If the report identifies materials that need monitoring or further investigation, assign an owner and a realistic completion date. Following asbestos surveys for schools, the dutyholder should make sure that identified risks, recommendations and any further investigation requirements are properly recorded and addressed.

Not every ACM needs to be removed. If materials are in good condition and can be managed safely in place, monitoring and suitable controls may be the appropriate response. If the material is damaged or likely to be disturbed, seek advice on the required controls and whether remedial work is needed. Removal should not be treated as the automatic answer in every case.

Before contractors begin work, provide the relevant asbestos register and management plan information. HSE guidance says information should be provided early enough to help contractors plan safely, ideally when quotations are being requested. Contractors should be competent for the work and understand the precautions required.

If suspected asbestos is accidentally damaged, stop work, keep people away from the area and follow the school’s emergency procedures. Do not attempt to clean it up or carry out repairs yourself. Obtain advice from an appropriate asbestos professional and follow the relevant reporting and safety procedures.

Planning ahead for the next school closure

Christmas access windows can fill quickly, particularly where schools are coordinating several maintenance jobs or working through a trust-wide programme. Early conversations help clarify the survey scope, access arrangements, reporting timescales and any likely follow-up requirements. They also reduce the risk of discovering too late that a planned project needs additional asbestos information. Whether the requirement involves a routine inspection or planned building work, asbestos surveys for schools should be arranged early enough to allow time for reporting and any necessary follow-up action.

For schools in England, the Department for Education and HSE provide practical guidance on managing asbestos, identifying dutyholders and checking existing arrangements. The school’s own health and safety procedures, local authority or trust requirements and the details of the proposed work should also inform the plan.

ACS can discuss asbestos survey requirements for school buildings and help you understand what information may be needed before planned work. If you are arranging asbestos surveys for schools, contact the team early to discuss your site, the areas involved and the intended timetable. Survey scope and availability will depend on the building and the work proposed.

Need Help Planning an Asbestos Survey for Your School?

Make your Christmas closure count. Speak to ACS about professional asbestos surveys for schools and get the right advice for your building and planned work

Call 01623 473214 or request a free quotation.

Frequently asked questions

Department for Education guidance for England says each school or college should have an up-to-date survey unless all structures on the site were wholly constructed after 2000. The survey needs to be suitable for the building and its intended use.

Not necessarily. A management survey supports the safe management of a building during normal occupation. Refurbishment or demolition work may require a more intrusive survey of the affected area before work begins.

No. Materials in good condition that are unlikely to be disturbed can often be managed safely in place. The decision should be based on the material’s condition, location, risk and the work planned, with advice from a competent professional.

It may be possible, depending on site access, survey scope and professional availability. Contact a survey provider early, explain the areas involved and allow time for the report to be reviewed before any follow-on work.

The dutyholder depends on the school’s arrangements. It may be the local authority, academy trust, governing body, proprietor or another party with maintenance or repair responsibilities. Some responsibilities may be shared, so the school should confirm its arrangements.