Refurbishment & Demolition Asbestos Surveys: 12 Frequently Asked Questions

Refurbishment & Demolition Asbestos Surveys: 12 Frequently Asked Questions

SSIP
ISO Certifications
Constructionline Gold
BDMA Associate
Avetta Member
Accreditation Logo
ACAD Logo

Refurbishment & Demolition Asbestos Surveys

If you’re planning to refurbish, alter or demolish a building constructed before 2000, arranging a Refurbishment & Demolition (R&D) Asbestos Survey should be one of your first steps. Many older buildings contain asbestos-containing materials (ACMs) hidden behind walls, ceilings, floor coverings and service voids. Disturbing these materials during construction can release hazardous fibres into the air, putting workers and occupants at risk.

Unlike a standard Management Survey, an R&D Survey is intrusive and specifically designed to locate asbestos that may be affected by planned building work. The survey follows the principles outlined in HSG264: Asbestos – The Survey Guide and helps duty holders, property owners, contractors and project managers comply with the Control of Asbestos Regulations 2012 (CAR 2012) and their responsibilities under CDM 2015.

Whether you’re renovating a school, refurbishing an office, upgrading social housing or preparing a commercial property for redevelopment, an R&D Survey provides the information needed to plan work safely and minimise costly project delays.

Below, we’ve answered some of the most common questions about Refurbishment & Demolition Asbestos Surveys.

ACS asbestos survey vehicle

Quick Answer: When Is an R&D Asbestos Survey Required?

A Refurbishment & Demolition Asbestos Survey should be completed before any work that could disturb a building’s structure or fabric. This includes refurbishment, renovation, structural alteration, fit-outs, roof works, kitchen and bathroom replacements, plant room upgrades and demolition.

For buildings constructed before 2000, an R&D Survey helps identify asbestos-containing materials before construction begins, protecting workers and helping avoid unexpected delays.

Before Building Work Begins

  • Office refurbishments
  • School renovations
  • Commercial fit-outs
  • Kitchen and bathroom upgrades
  • Roof repairs and replacements
  • Plant room upgrades
  • Structural alterations
  • Full demolition projects

Supporting Safe Refurbishment and Demolition Projects

A Refurbishment & Demolition Survey follows the principles set out in HSG264: Asbestos – The Survey Guide. It is designed to investigate the areas affected by planned works, including hidden and inaccessible locations that would not normally be inspected during a Management Survey.

Surveyors use building drawings, work schedules and project information to determine where intrusive investigation is required. This can include wall cavities, floor voids, ceiling voids, roof spaces, service risers, basements, electrical cupboards and plant rooms.

Where access is not possible, the limitation is clearly recorded in the report so it can be addressed before work proceeds.

Management Survey vs Refurbishment & Demolition Survey

Management SurveyRefurbishment & Demolition Survey
For occupied buildingsBefore refurbishment or demolition
Generally non-intrusiveIntrusive where required by the works
Supports routine asbestos managementIdentifies asbestos before construction
Used during normal occupationUsed for planned building works
Supports an asbestos management planSupports safe project planning and contractor controls

Thorough Survey Planning

We review project information and planned works to define the areas requiring investigation.

Controlled Sampling

Samples are collected using controlled techniques, labelled and recorded for laboratory analysis.

Clear Survey Reports

Reports include asbestos findings, sample results, photographs, plans, limitations and recommendations.

ACS asbestos surveying and compliance support

Need an Asbestos Survey Before Building Work Starts?

Speak with ACS about refurbishment surveys, demolition surveys, asbestos sampling and practical support for your upcoming project.

Refurbishment & Demolition Asbestos Survey FAQs

Below are answers to common questions about arranging an asbestos survey before refurbishment, alteration or demolition work.

A Refurbishment & Demolition (R&D) Asbestos Survey is an intrusive inspection carried out before refurbishment, structural alterations or demolition work begins. Its purpose is to identify asbestos-containing materials (ACMs) that could be disturbed during the planned works.

Unlike a Management Survey, which assesses asbestos during normal occupation, an R&D Survey may involve opening walls, ceilings and floors to inspect hidden areas. The findings help contractors plan work safely, protect occupants and workers, and comply with the Control of Asbestos Regulations 2012 before construction starts.

An R&D Survey should be completed before any work begins that could disturb the building’s structure or fabric. This includes projects such as office refurbishments, school renovations, kitchen and bathroom replacements, roof repairs, shop fit-outs, plant room upgrades and full building demolitions.

If the property was built before 2000, there’s a possibility that asbestos-containing materials may still be present. Identifying them before work starts helps prevent accidental exposure, protects everyone on site and avoids costly delays if asbestos is discovered during construction.

Although both surveys identify asbestos-containing materials, they are carried out for different reasons.

A Management Survey is designed for buildings that remain occupied. It identifies asbestos that could be disturbed during normal day-to-day activities and supports an ongoing asbestos management plan.

A Refurbishment & Demolition Survey is much more intrusive. It involves opening up parts of the building to inspect hidden areas that will be affected by refurbishment or demolition works. Because of its invasive nature, it is usually carried out in vacant areas before construction begins.

Management SurveyRefurbishment & Demolition Survey
For occupied buildingsBefore refurbishment or demolition
Generally non-intrusiveFully intrusive where required
Supports asbestos managementIdentifies asbestos before construction
Routine occupationPlanned building works

Choosing the correct survey ensures legal compliance while reducing health and safety risks.

In many cases, the areas being surveyed will need to be vacant because the inspection involves opening walls, lifting flooring, removing ceiling tiles and accessing concealed spaces. These activities may disturb asbestos-containing materials if they are present.

However, depending on the size of the building and the scope of the refurbishment, it may be possible to carry out the survey in phases while unaffected areas remain occupied and operational.

Planning access in advance helps ensure the survey is completed safely and efficiently.

The survey focuses on every part of the building that could be affected by the planned works. This may include wall cavities, ceiling voids, floor voids, roof spaces, plant rooms, service risers, basements, electrical cupboards and other concealed areas that are not normally inspected during a Management Survey.

Surveyors use refurbishment drawings and project information to determine which areas require investigation. If access to certain locations isn’t possible, these limitations will be clearly recorded in the final report so they can be addressed before work begins.

Asbestos samples are collected using controlled techniques by trained surveyors and are carefully labelled, recorded and sent for laboratory analysis. Samples may be taken from materials such as textured coatings, insulation, floor tiles, cement products and ceiling materials, depending on the survey scope.

At ACS, samples are analysed by a UKAS-accredited laboratory, helping ensure the analysis is carried out to recognised quality standards.

ACS is also UKAS ISO/IEC 17020 accredited for asbestos surveying, providing independent recognition of the competence and quality of our surveying and inspection processes.

HSG264: Asbestos – The Survey Guide is the Health and Safety Executive’s (HSE) recognised guidance for carrying out asbestos surveys. It sets out industry best practice on survey planning, inspection techniques, sampling, reporting and quality standards.

Professional asbestos surveyors follow HSG264 to ensure surveys are thorough, consistent and reliable. Although it is guidance rather than legislation, it is widely accepted as the benchmark for asbestos surveying across the UK.

Choosing a company that works in accordance with HSG264 gives you greater confidence that potential asbestos risks have been properly assessed before refurbishment or demolition work begins.

The duration of an R&D Survey depends on the size and complexity of the building, as well as the extent of the planned refurbishment works. A small commercial unit or residential property may take only a few hours, while larger schools, offices, hospitals or industrial buildings can require several days to complete.

Providing building plans and details of the proposed works before the survey can help surveyors understand the project scope and identify the areas that need to be inspected.

The time required to complete and issue a survey report depends on several factors, including the size and complexity of the property, the number of samples requiring laboratory analysis, the survey scope and site location.

Once the inspection and analysis are complete, ACS provides a detailed report outlining the survey findings, including identified asbestos-containing materials, sample results, photographs, plans and relevant recommendations.

If you have a project deadline, it’s best to discuss this when arranging your survey so the required timescale can be considered at the planning stage.

Finding asbestos does not necessarily mean that your project has to stop. The survey identifies where asbestos-containing materials (ACMs) are present and assesses whether they are likely to be disturbed by the planned works.

For major refurbishment or full demolition, Regulation 7 of the Control of Asbestos Regulations 2012 places a specific duty on the dutyholder to have asbestos-containing materials removed, so far as reasonably practicable, before work begins.

Depending on the material, its condition and the planned works, the appropriate action may include removal, encapsulation or leaving the material in place with suitable controls. Higher-risk ACMs that are likely to be disturbed will generally require specialist asbestos removal before other work proceeds.

Not all asbestos work carries the same legal requirements. The correct category depends on the type of asbestos-containing material, its condition and how the work will be carried out.

Higher-risk materials, such as pipe insulation, sprayed coatings and some asbestos insulating board (AIB), generally count as licensable work. This requires a licensed asbestos contractor and notification to the relevant enforcing authority before work begins.

Lower-risk materials, including many asbestos cement products and certain vinyl floor tiles, do not usually require a licence. However, some non-licensed work must still be notified. This is known as Notifiable Non-Licensed Work (NNLW). Other non-licensed work may be exempt from notification if it meets specific conditions.

Because the correct category depends on the material, its condition and the proposed work, an accurate asbestos survey is an essential first step in determining the appropriate controls and requirements.

The responsibility for arranging an R&D Survey usually rests with the person or organisation commissioning the refurbishment or demolition work. This may include commercial property owners, landlords, facilities managers, schools, housing associations, local authorities, developers or principal contractors.

Booking the survey during the planning stage helps identify asbestos risks early, allowing sufficient time for any necessary removal work before construction begins. Early planning can reduce project delays, support compliance with UK legislation and create a safer working environment for everyone involved.

Why Choose ACS for Your Refurbishment & Demolition Survey?

Choosing the right asbestos survey provider is an important part of planning refurbishment and demolition work. At ACS, our surveyors are qualified, authorised and regularly audited, helping ensure surveys are carried out to a consistent professional standard.

ACS is UKAS ISO/IEC 17020 accredited for asbestos surveying, providing independent recognition of our competence and quality management as an inspection body. Our asbestos samples are analysed by a UKAS ISO/IEC 17025-accredited laboratory, which is part of our sister company.

We provide nationwide coverage and can also accommodate emergency survey requirements where needed. Our experienced surveyors carry out thorough inspections in line with recognised industry guidance and provide clear reporting to help clients understand asbestos risks before work begins.

Whether you’re refurbishing a single property or managing a large commercial redevelopment, ACS can help you plan your project with confidence.

Ready to Start Your Project?

If you’re planning refurbishment or demolition work, don’t leave asbestos to chance. Arranging a Refurbishment & Demolition Asbestos Survey before work begins can help protect workers, reduce project delays and ensure you have the information needed to make informed decisions.

ACS provides professional asbestos surveys for commercial properties, schools, housing providers, industrial premises and other buildings across the UK.

Contact ACS today to discuss your project and arrange your Refurbishment & Demolition Asbestos Survey before construction begins.