If you are planning to refurbish, alter or demolish a building constructed before 2000, arranging a Refurbishment & Demolition Asbestos Survey should be one of the first stages of your project.
Many older buildings contain asbestos-containing materials hidden behind walls, ceilings, floor coverings and within service voids. Disturbing these materials during building work can release hazardous fibres into the air, putting workers and occupants at risk.
Unlike a standard Management Survey, a Refurbishment & Demolition Survey is intrusive and specifically designed to locate asbestos that may be affected by planned building work. It helps duty holders, property owners, contractors and project managers plan safely and reduce costly project delays.

Quick Answer: When Is an R&D Asbestos Survey Required?
A Refurbishment & Demolition Asbestos Survey should be completed before any work that could disturb a building’s structure or fabric. This includes refurbishment, renovation, structural alteration, fit-outs, roof works, kitchen and bathroom replacements, plant room upgrades and demolition.
For buildings constructed before 2000, an R&D Survey helps identify asbestos-containing materials before construction begins, protecting workers and helping avoid unexpected delays.
Before Building Work Begins
- Office refurbishments
- School renovations
- Commercial fit-outs
- Kitchen and bathroom upgrades
- Roof repairs and replacements
- Plant room upgrades
- Structural alterations
- Full demolition projects
Supporting Safe Refurbishment and Demolition Projects
A Refurbishment & Demolition Survey follows the principles set out in HSG264: Asbestos – The Survey Guide. It is designed to investigate the areas affected by planned works, including hidden and inaccessible locations that would not normally be inspected during a Management Survey.
Surveyors use building drawings, work schedules and project information to determine where intrusive investigation is required. This can include wall cavities, floor voids, ceiling voids, roof spaces, service risers, basements, electrical cupboards and plant rooms.
Where access is not possible, the limitation is clearly recorded in the report so it can be addressed before work proceeds.
Management Survey vs Refurbishment & Demolition Survey
| Management Survey | Refurbishment & Demolition Survey |
|---|---|
| For occupied buildings | Before refurbishment or demolition |
| Generally non-intrusive | Intrusive where required by the works |
| Supports routine asbestos management | Identifies asbestos before construction |
| Used during normal occupation | Used for planned building works |
| Supports an asbestos management plan | Supports safe project planning and contractor controls |
Thorough Survey Planning
We review project information and planned works to define the areas requiring investigation.
Controlled Sampling
Samples are collected using controlled techniques, labelled and recorded for laboratory analysis.
Clear Survey Reports
Reports include asbestos findings, sample results, photographs, plans, limitations and recommendations.

Need an Asbestos Survey Before Building Work Starts?
Speak with ACS about refurbishment surveys, demolition surveys, asbestos sampling and practical support for your upcoming project.
Refurbishment & Demolition Asbestos Survey FAQs
Below are answers to common questions about arranging an asbestos survey before refurbishment, alteration or demolition work.
1. What is a Refurbishment & Demolition Asbestos Survey?
A Refurbishment & Demolition, or R&D, Asbestos Survey is an intrusive inspection carried out before refurbishment, structural alterations or demolition work begins. Its purpose is to identify asbestos-containing materials that could be disturbed during the planned works.
Unlike a Management Survey, an R&D Survey may involve opening walls, ceilings and floors to inspect hidden areas. The findings help contractors plan work safely, protect workers and occupants, and comply with the Control of Asbestos Regulations 2012 before construction starts.
2. When do I need a Refurbishment & Demolition Asbestos Survey?
An R&D Survey should be completed before any work that could disturb the building’s structure or fabric. This includes office refurbishments, school renovations, kitchen and bathroom replacements, roof repairs, shop fit-outs, plant room upgrades and full building demolitions.
If the property was built before 2000, asbestos-containing materials may still be present. Identifying them before work starts helps prevent accidental exposure and avoids delays if asbestos is discovered during construction.
3. How is an R&D Survey different from a Management Survey?
A Management Survey is designed for buildings that remain occupied. It identifies asbestos that could be disturbed during normal day-to-day activities and supports an ongoing asbestos management plan.
A Refurbishment & Demolition Survey is more intrusive. It involves opening parts of the building to inspect concealed areas that will be affected by refurbishment or demolition works. Because of its invasive nature, it is usually carried out in vacant areas before construction begins.
4. Can a building remain occupied during an R&D Survey?
In many cases, the areas being surveyed need to be vacant because the inspection can involve opening walls, lifting flooring, removing ceiling tiles and accessing concealed spaces. These activities may disturb asbestos-containing materials if they are present.
Depending on the building size and refurbishment scope, it may be possible to carry out the survey in phases while unaffected areas remain operational. Planning access in advance helps ensure the survey is completed safely and efficiently.
5. What areas are inspected during a Refurbishment & Demolition Survey?
The survey focuses on every part of the building that could be affected by the planned works. This may include wall cavities, ceiling voids, floor voids, roof spaces, plant rooms, service risers, basements, electrical cupboards and other concealed areas.
Surveyors use refurbishment drawings and project information to determine which areas require investigation. If access to certain locations is not possible, these limitations are recorded in the final report so they can be addressed before work begins.
6. How are asbestos samples collected and tested?
Asbestos samples are collected using controlled techniques by trained surveyors. They are carefully labelled, recorded and sent for laboratory analysis. Samples may be taken from materials such as textured coatings, insulation, floor tiles, cement products and ceiling materials, depending on the survey scope.
At ACS, samples are analysed by a UKAS-accredited laboratory. ACS is also UKAS ISO/IEC 17020 accredited for asbestos surveying, providing independent recognition of the competence and quality of our surveying and inspection processes.
7. What is HSG264 and why is it important?
HSG264: Asbestos – The Survey Guide is the Health and Safety Executive’s recognised guidance for carrying out asbestos surveys. It sets out industry best practice on survey planning, inspection techniques, sampling, reporting and quality standards.
Although it is guidance rather than legislation, it is widely accepted as the benchmark for asbestos surveying across the UK. Choosing a provider that works in accordance with HSG264 gives greater confidence that potential asbestos risks have been properly assessed.
8. How long does a Refurbishment & Demolition Survey take?
The duration of an R&D Survey depends on the size and complexity of the building and the extent of the planned refurbishment works. A small commercial unit or residential property may take a few hours, while larger schools, offices, hospitals or industrial buildings can require several days.
Providing building plans and details of the proposed works before the survey can help surveyors understand the project scope and identify the areas that need to be inspected.
9. How quickly will I receive the survey report?
Report timescales depend on the size and complexity of the property, the number of samples requiring laboratory analysis, the survey scope and site location.
Once the inspection and analysis are complete, ACS provides a detailed report outlining identified asbestos-containing materials, sample results, photographs, plans and relevant recommendations. If you have a project deadline, discuss this when arranging your survey.
10. What happens if asbestos is found during the survey?
Finding asbestos does not necessarily mean that your project has to stop. The survey identifies where asbestos-containing materials are present and assesses whether they are likely to be disturbed by the planned works.
For major refurbishment or full demolition, Regulation 7 of the Control of Asbestos Regulations 2012 places a specific duty on the dutyholder to have asbestos-containing materials removed, so far as reasonably practicable, before work begins.
Depending on the material, its condition and the planned works, the appropriate action may include removal, encapsulation or leaving the material in place with suitable controls.
11. What is the difference between licensable, notifiable and non-notifiable asbestos work?
Not all asbestos work carries the same legal requirements. The correct category depends on the type of asbestos-containing material, its condition and how the work will be carried out.
Higher-risk materials, such as pipe insulation, sprayed coatings and some asbestos insulating board, generally count as licensable work. This requires a licensed asbestos contractor and notification to the relevant enforcing authority before work begins.
Lower-risk materials, including many asbestos cement products and certain vinyl floor tiles, do not usually require a licence. Some non-licensed work must still be notified as Notifiable Non-Licensed Work, or NNLW. An accurate asbestos survey is an essential first step in identifying the correct requirements and controls.
12. Who needs to arrange a Refurbishment & Demolition Asbestos Survey?
The responsibility for arranging an R&D Survey usually rests with the person or organisation commissioning the refurbishment or demolition work. This may include commercial property owners, landlords, facilities managers, schools, housing associations, local authorities, developers or principal contractors.
Booking the survey during the planning stage helps identify asbestos risks early, allowing sufficient time for any necessary removal work before construction begins. Early planning can reduce project delays, support compliance and create a safer working environment.
Ready to Start Your Project?
ACS provides Refurbishment & Demolition Asbestos Surveys for commercial properties, schools, housing providers, industrial premises and other buildings across the UK.
Contact our team to discuss your project and arrange your asbestos survey before construction begins.